Success Cases

Real faults.
Found early.

Three installations where the power was still on, the equipment was still running, and the data had already changed. Each one is paired with the GES screen the engineer was actually looking at.

CASE 01Data Center UPS

The UPS Was Still Running.GES Detected the Problem.

A critical UPS system was operating under load.

GES detected abnormal current behavior and phase imbalance, indicating a developing internal UPS fault.

Result:

Early detection enabled investigation before the condition developed into a serious failure.

The UPS Was Still Running — The data was already telling a different story.

GES per-phase current chart showing abnormal current behaviour and phase imbalance

CASE 02Loose Connection

A Loose Connection.Detected Before Failure.

GES identified an abnormal increase in contact resistance on a main phase conductor.

Field inspection revealed a cracked connector and early signs of overheating.

Result:

The maintenance team repaired the connection before it threatened operational continuity.

GES saw the signs early.

GES contact-resistance trend showing a step change on one phase

CASE 03Grounding System

The Power Was On.The Protection Was Compromised.

GES detected abnormal fault-loop impedance and changes in electrical potentials.

Field inspection confirmed damage to the grounding system.

Result:

The grounding system was restored before the facility was exposed to serious safety risks.

GES detected what conventional monitoring could not see.

GES three-phase voltage and current capture around a grounding-system event

Continuous monitoring. Early detection. Maximum uptime. Protect your people, your assets, and your business.

What would GES find in your facility?

Every one of these started as a normal-looking board. Ask ESP to look at yours.